California
- Details
Redlands Community Hospital 3/4", 2" and 3" Pipe Freeze Plugs on Domestic Copper HOT and COLD Water Line under 110 degrees F.
Job Date: September 11, 2017
JOB LOCATION: Torrance, CA.
PROJECT: Torrance Medical Center
Job Specifics:
1 – Mobilization – Prep / Travel to job site
Item I – .75” - Freeze Plug on Domestic Copper HOT Water Line – under 110 degrees (F)
1 – .75” FreezePlug on .75” Copper waterline, under 110 degree (F) Under 150 psi.
FreezePlug held for up to 2 hours each freeze while you perform modifications to the pipeline
Item II – 2” - Freeze Plug on Domestic Copper HOT Water Line – under 110 degrees (F)
1 – 2” FreezePlug on 2” Copper waterline, under 110 degree (F) Under 150 psi.
FreezePlug held for up to 2 hours each freeze while you perform modifications to the pipeline
Item III – 3” - Freeze Plug on Domestic Copper Cold Water Line – under 110 degrees (F)
2 – 3” FreezePlugs on 3” Copper waterline, under 110 degree (F) Under 150 psi.
FreezePlug held for up to 2 hours each freeze while you perform modifications to the pipeline
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .
- Details
24" and 30" Linestop on RCP Water Main under 60 PSI No By-pass
Job Date: September 25, 2017
JOB LOCATION: Whittier, CA.
PROJECT: Torrance Medical Center
Job Specifics: Whittier Line stop Project
1 – Mobilization – Prep / Travel to job site
Item l - 30” Linestop® on 30” RCP Water Main - under 60 psi – No By-pass
2 - Mobilization – Prep / Travels to Site
1 - 30” x 24” Linestop® Fitting for RCP waterline (ANSI 150 Fitting)
(JCM 442 Fusion Epoxy Coated with Stainless Steel Bolts & Double Gasket)
1 - Install & Pressure Test Linestop® Fitting, Hottap Pipe, and install Linestop®
1 - 30” Linestop® held for up to 3 Days while you perform pipeline modifications
1 - Removal of Linestop and installation of Completion Plug with Blind Flange
1 - Blow-off assembly as required
Item Il - 24” Linestop® on 24” RCP Water Main - under 60 psi – No By-pass
2 - Mobilization – Prep / Travels to Site
1 - 24” x 16” Linestop® Fitting for RCP waterline (ANSI 150 Fitting)
(JCM 442 Fusion Epoxy Coated with Stainless Steel Bolts & Double Gasket)
1 - Install & Pressure Test Linestop® Fitting, Hottap Pipe, and install Linestop®
1 - 24” Linestop® held for up to 3 Days while you perform pipeline modifications
1 - Removal of Linestop and installation
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .
- Details
6" hot tap for County of San Bernardino in Oak Hill, California
Job Date: November 27, 2017
JOB LOCATION: Seattle, WA.
PROJECT: 8" Pipe Freeze Plugs
Job Specifics:
Item I – 6” Hottap on Transite – A/C Waterline under 150 psi.
1 – 6” Hottap on Transite – A/C Waterline – below ground under 150 psi (Hottap ONLY on your pre-installed fittings and Valve)
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .
- Details
2.5" and 6" Hottaps on Hot and Cold Water Pipeline at Illumina Facility San Diego
Job Date: September 22, 2017
JOB LOCATION: San Diego, CA.
PROJECT: Illumina Facility
Job Specifics:
1 – Mobilization – Prep / Travel to job site
Item I – 2.5” Hot Tap on 3” Sch. 40 Carbon Steel Hot Water Line – under 150 psi
2 –2.5” Hot Tap on 3” Carbon Steel Hot Water line- under 150 psi /under 150 degrees
****Through Customer Supplied & Installed Fitting And Full Port Valve***
Item II – 6” Hot Tap on 12” Sch. 40 Carbon Steel Chilled Water Line
2 – 6” Hot Tap on 12” Carbon Steel Chilled Water line - under 150 psi
****Through Customer Supplied & Installed Fitting And Full Port Valve***
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .
- Details
28" Linestop with 20" hot tap for bypass in San Francisco, California
Job Date: January 31, 2017
JOB LOCATION: San Francisco, CA.
PROJECT: 28" Linestops and 20" hottaps
Job Specifics:
Item I: Linestop® on 28” OD HDPE Gravity Raw Sewer Main Pipeline 60 psi (approx) With 20” By-pass Outlet.
1 – Mobilization – Prep / Travel to site
2 – 28” Linestop Fittings for 28” OD HDPE Sewage Pipeline (100 psi or less) (JCM Epoxy Coated Fitting w/ Stainless Steel Bolts)
2 - Installation of Saddle with Air Test
2 - Hot Tap Pipeline for Linestop entry
2 – Insertion of 28” Linestop for up to 12 Hours while others perform pipeline work.
2 - By-pass Outlets (20”) off Linestop Machines, with
2 - 20” Knife Gate Loaner Valves
2 – Removal of Linestops, install Completion Plugs and Blind Flanges
2 - 2” Saddle w/ Corp. Stop and Tap for Blow Down and equalizing pressure to remove Linestop (if Required)
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .