IFT Featured San Francisco, CA. Job: 28" Linestop with 20" hot tap for bypass
- Details
IFT Featured San Francisco, CA. Job: 28" Linestop with 20" hot tap for bypass - 5.0 out of
5
based on
3 reviews
28" Linestop with 20" hot tap for bypass in San Francisco, California
Job Status: Successful and Completed
Job Date: January 31, 2017
JOB LOCATION: San Francisco, CA.
PROJECT: 28" Linestops and 20" hottaps
Job Specifics:
Item I: Linestop® on 28” OD HDPE Gravity Raw Sewer Main Pipeline 60 psi (approx) With 20” By-pass Outlet.
1 – Mobilization – Prep / Travel to site
2 – 28” Linestop Fittings for 28” OD HDPE Sewage Pipeline (100 psi or less) (JCM Epoxy Coated Fitting w/ Stainless Steel Bolts)
2 - Installation of Saddle with Air Test
2 - Hot Tap Pipeline for Linestop entry
2 – Insertion of 28” Linestop for up to 12 Hours while others perform pipeline work.
2 - By-pass Outlets (20”) off Linestop Machines, with
2 - 20” Knife Gate Loaner Valves
2 – Removal of Linestops, install Completion Plugs and Blind Flanges
2 - 2” Saddle w/ Corp. Stop and Tap for Blow Down and equalizing pressure to remove Linestop (if Required)
Job Date: January 31, 2017
JOB LOCATION: San Francisco, CA.
PROJECT: 28" Linestops and 20" hottaps
Job Specifics:
Item I: Linestop® on 28” OD HDPE Gravity Raw Sewer Main Pipeline 60 psi (approx) With 20” By-pass Outlet.
1 – Mobilization – Prep / Travel to site
2 – 28” Linestop Fittings for 28” OD HDPE Sewage Pipeline (100 psi or less) (JCM Epoxy Coated Fitting w/ Stainless Steel Bolts)
2 - Installation of Saddle with Air Test
2 - Hot Tap Pipeline for Linestop entry
2 – Insertion of 28” Linestop for up to 12 Hours while others perform pipeline work.
2 - By-pass Outlets (20”) off Linestop Machines, with
2 - 20” Knife Gate Loaner Valves
2 – Removal of Linestops, install Completion Plugs and Blind Flanges
2 - 2” Saddle w/ Corp. Stop and Tap for Blow Down and equalizing pressure to remove Linestop (if Required)
OR Call
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .