IFT Featured Texas Job: 2- 30” Linestops on PCCP Water Main with By Pass
- Details
IFT Featured Texas Job: 2- 30” Linestops on PCCP Water Main with By Pass - 5.0 out of
5
based on
6 reviews
2- 30” Linestops on PCCP Water Main with By Pass in Corsicana, Texas
Job Status: Job completed.
Job Date: May 30, 2018
Location: Corsicana, Texas
Job Specifics: 2- Linestop 30” PCCP Water Main with By Pass
Line Pressure: 100 PSI working pressure or less Line Contents:
Water Main Pipe Material: PCCP B-303
Pipe Specifications: Pipe OD = 35.00” Max – Cylinder OD = 31.875”
ltem l Linestop 30” PCCP Water Main with By Pass
1 – Set Up and Mobilization to site
2 – 30” Linestop Fittings for PCCP Water Pipeline (100 PSI or less) (JCM 445 Primer Coated Bodies / Epoxy Coated Water Way – Alloy bolts)
2 – 24” Hot Taps to allow for linestop entry
2 - 2” Saddles with Taps for blow off and equalizing to remove linestops (JCM 425 Primer Coated Bodies / Epoxy Coated Water Way – Alloy bolts)
2 – Insertion of 30” linestop for 7 Days or Less 2– Removal of Linestop, install Completion Plugs and Blind Flanges.
Job Date: May 30, 2018
Location: Corsicana, Texas
Job Specifics: 2- Linestop 30” PCCP Water Main with By Pass
Line Pressure: 100 PSI working pressure or less Line Contents:
Water Main Pipe Material: PCCP B-303
Pipe Specifications: Pipe OD = 35.00” Max – Cylinder OD = 31.875”
ltem l Linestop 30” PCCP Water Main with By Pass
1 – Set Up and Mobilization to site
2 – 30” Linestop Fittings for PCCP Water Pipeline (100 PSI or less) (JCM 445 Primer Coated Bodies / Epoxy Coated Water Way – Alloy bolts)
2 – 24” Hot Taps to allow for linestop entry
2 - 2” Saddles with Taps for blow off and equalizing to remove linestops (JCM 425 Primer Coated Bodies / Epoxy Coated Water Way – Alloy bolts)
2 – Insertion of 30” linestop for 7 Days or Less 2– Removal of Linestop, install Completion Plugs and Blind Flanges.
OR call
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .