Services
Complete the form & we will get back to you.
- Job Status: Job completed.
- Job Date: February 5, 2019
- Location: Dover, Delaware
- IFT is pleased to submit the following quotation.
- For Linestop® Services
- Line Pressure: 50 or less
- Line Contents: Sewage Force Main
- Flow Rate: Less Than 1 Feet per second (FPS) Flow Rate
- Pipe Material: PCCP L-301
- Pipe Specifications: 30” – Horizontal Linestops
- Saddles: JCM 445 Carbon Steel Primer Coated W / Alloy Straps & Hardware.
- Completion Plug: Carbon Steel Primer Coated
- Blind Flange: Steel 150# CL D Epoxy Coated W / 2 Lifting Lugs
- Maximum Flow Rate allowed: Flow rates of 1 ft/sec shall not be exceeded.
- ltem l Linestop® 30” PCCP Sewage Force Main – 24” By Pass
- 2 – Set Up and Mobilization to site
- 2 – 24” Hot Taps to allow for linestop entry
- 2 – Insertion of 30” linestop for 14 Days or Less
- 2– Removal of Linestop, install Completion Plugs and Blind Flanges. (30” ANSI 150# Flanged outlet off linestop equipment for your bypass)
- Item 2 – Expediting Saddles
- 2 – Expedite the manufacturing of 2 JCM 445 saddles to ship by Friday 2-8-19
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .
72" Linestop® with a 100% Shutdown on a Steel Water Main in Houston, Texas
- Job Status: Job completed.
- Job Date: March 26, 2019
- Location: Waterline Improvements - Houston 72” Linestop® Emancipation Avenue
- IFT is pleased to introduce the following completed 72" Linestop® project.
- For Linestop® Services
- Line Pressure: 100 or less
- Line Contents: Water Main
- Flow Rate: Less Than .5 Feet per second (FPS)
- Pipe Material: Steel Pipe
- Pipe Specifications: 72” – Horizontal Linestop®
- Fitting: Carbon Steel Primer Coated & Hardware.
- Completion Plug: Carbon Steel Primer Coated
- Blind Flange: Steel 150# CL D Epoxy Coated W / 2 Lifting Lugs
- Maximum Flow Rate allowed: Flow rates of 1 ft/sec shall not be exceeded.
72” – Diameter Linestop®
Linestop® Fitting
1 – Linestop fitting with Completion plug, Blind flange and NBG set
Linestop® Service Municipal Pipeline - Water
Installation/Welding of fitting by others
1- Pressure test
1 – Loaner Valve for Linestop
1 – Insertion of Temporary linestop (up to 14 days) (Under 100 PSI)
1 - Removal of Linestop and valve with completion plug and Blind Flange
installation
Machinery rental.
Reinsertion of 72” Diameter Linestop®
1 – Removal of Blind flange
1- Installation of Temporary Loaner valve
1 – Removal of Completion Plug
1 – Insertion of Temporary linestop (up to 14 days) (Under 100 PSI)
1 - Removal of Linestop and valve with completion plug and Blind Flange
installation
Machinery rental.
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .