• Job Status: Job completed. 
  • Job Date: February 5, 2019
  • Location: Dover, Delaware

  • IFT is pleased to submit the following quotation. 
  • For Linestop® Services 
  • Line Pressure: 50 or less
  • Line Contents: Sewage Force Main
  • Flow Rate: Less Than 1 Feet per second (FPS) Flow Rate 
  • Pipe Material: PCCP L-301
  • Pipe Specifications: 30” – Horizontal Linestops
  • Saddles: JCM 445 Carbon Steel Primer Coated W / Alloy Straps & Hardware.
  • Completion Plug: Carbon Steel Primer Coated
  • Blind Flange: Steel 150# CL D Epoxy Coated W / 2 Lifting Lugs
  • Maximum Flow Rate allowed: Flow rates of 1 ft/sec shall not be exceeded.

  • ltem l Linestop® 30” PCCP Sewage Force Main – 24” By Pass 
  • 2 – Set Up and Mobilization to site 
  • 2 – 24” Hot Taps to allow for linestop entry
  • 2 – Insertion of 30” linestop for 14 Days or Less
  • 2– Removal of Linestop, install Completion Plugs and Blind Flanges. (30” ANSI 150# Flanged outlet off linestop equipment for your bypass)

  • Item 2 – Expediting Saddles
  • 2 – Expedite the manufacturing of 2 JCM 445 saddles to ship by Friday 2-8-19