Featured Work
- Details
72" Linestop® with a 100% Shutdown on a Steel Water Main in Houston, Texas
- Job Status: Job completed.
- Job Date: March 26, 2019
- Location: Waterline Improvements - Houston 72” Linestop® Emancipation Avenue
- IFT is pleased to introduce the following completed 72" Linestop® project.
- For Linestop® Services
- Line Pressure: 100 or less
- Line Contents: Water Main
- Flow Rate: Less Than .5 Feet per second (FPS)
- Pipe Material: Steel Pipe
- Pipe Specifications: 72” – Horizontal Linestop®
- Fitting: Carbon Steel Primer Coated & Hardware.
- Completion Plug: Carbon Steel Primer Coated
- Blind Flange: Steel 150# CL D Epoxy Coated W / 2 Lifting Lugs
- Maximum Flow Rate allowed: Flow rates of 1 ft/sec shall not be exceeded.
72” – Diameter Linestop®
Linestop® Fitting
1 – Linestop fitting with Completion plug, Blind flange and NBG set
Linestop® Service Municipal Pipeline - Water
Installation/Welding of fitting by others
1- Pressure test
1 – Loaner Valve for Linestop
1 – Insertion of Temporary linestop (up to 14 days) (Under 100 PSI)
1 - Removal of Linestop and valve with completion plug and Blind Flange
installation
Machinery rental.
Reinsertion of 72” Diameter Linestop®
1 – Removal of Blind flange
1- Installation of Temporary Loaner valve
1 – Removal of Completion Plug
1 – Insertion of Temporary linestop (up to 14 days) (Under 100 PSI)
1 - Removal of Linestop and valve with completion plug and Blind Flange
installation
Machinery rental.
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .
- Details
5” Pipe Freeze Plug and 6" Linestop for St. Joseph Hospital
Job Date: October 19, 2015
JOB LOCATION: Santa Ana, CA. PROJECT: FreezePlugs / Linestop
Job Specifics:
Item 1.
1 - 5” Indoor Pipe Freeze Plug on 5” Carbon Steel Water Pipe
1 - Travel to job site
1 – 5” FreezePlug on Carbon Steel Water Pipe under 150 PSI / 100 degrees or less
1 - Hold FreezePlug for up to 4 hours each. Item 2. 6” Linestop on 6” Carbon Steel Domestic Water Pipe
1 – 6” Linestop fitting for Domestic Carbon Steel Water Pipe under 150 PSI / 100 degrees
1 - Weld on Tapping Saddle
1 - Pressure test fitting and Hot Tap pipe.
1 - 6” Linestop held for up to 4 hours while you perform pipeline modifications
1 - Removal of Linestop and installation of completion plug with cap. Blow-off assembly as required.
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .
- Details
3" and 12" Hottaps and a 12" Linestop
Job Date: October 11, 2014
Location: Lake Havasu, AZ
Job Specifics: 1 -Travel to site to tap 3" & install Linestop
1 -Travel to site to Remove Linestop
Item 1-3" Hottap on 12" A/C Waterline
1 - 3" Hot tap through your materials (flanged Valve)
Item II - 12" Hottap on 12" A/C Waterline
1 - 12" Hot tap through your materials (flanged or MJ Valve)
Item III-12" Linestop on A/C Waterline
1 - 12" Linestop fitting for domestic waterline at or under 150PSI
1 - Install of 12" Linestop & held for up to 7 days while you perform pipeline modifications
1 - Removal of linestop and install completion plug with blind flange
1 - Blow-off assembly as required
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .
- Details
IFT Featured Missouri Job: 48" Hottap for a 72" Linestop with a 48" By Pass
Job Date: Oct 28, 2016
Location: Kansas City, Missouri
Job Specifics:
1 - Hottap 72" x 48'' Pre Stressed Concrete Pipeline (PCCP) with By Pass
1 -72" x 48" Hottap Fitting for PCCP (apx. 40-PSI) (JCM 445 Shop Coated with Epoxy Coated Water Way)
1 -Installation of Hot Tap Fitting (Others to Provide 48" Gate Valve with Installation and Provide Support of Valve)
1 - Pressure Test of Assembly & 48" Hottap
1- 48" Loaner Valve Loaner
48" Knife Gate for Bypass- Removed Under Pressure after By Pass is Terminated. Includes Setting 48" Completion Plug and Supply Blind Flange with Zinc Plated NBG Sets.
1 - 72" Linestop Fitting for PCCP- 72" Inside Diameter (ID) (40 PSI or less) Less than 6 FPS (JCM 445 Shop Coated with Epoxy Coated Water Way)
1- Hot Tap to Allow for Linestop Entry
1 - Insertion of 72" Linestop
1 - 4'' Saddle with Gate Valve and Tap for Blow Down and Equalizing Pressure to Remove Linestops
1- Removal of Linestop, Install Completion Plug and Blind Flange Linestop Held for (7) days.
Linestop® • Valve Inserting • Pipefreeze® • Large Tapping Linestop® is a registered Trademark and Servicemark of International Flow Technologies, Inc.
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .
48" Hottap for a 72" Linestop with a 48" By Pass Video
The City of Kansas City presented IFT with the opportunity to provide our services in order to allow the replacement of 72” valves on a Pre-Stressed Concrete Cylinder Pipe (PCCP) sewage force-main. Their 72” force-main being under pressure was a critical component of the Kansas City sewage collection system and the line could not be shut down.
Continuation of the raw sewage flow was performed by direct pumping from the wet-well into two 48” temporary pipelines that were hot tapped upstream of the 72” Linestop®. The 72” Linestop® plugged sewage from heading toward the wet well infrastructure thus allowing various large diameter valves to be replaced without a shutdown.
This raw sewage was successfully bypassed with use of the IFT Linestop® so the 72” pipeline remained active while the system was upgraded. IFT provides Large Linestop® services on most types of pipelines through 78”. IFT now headed to Houston to perform another 72” Linestop.
- Details
Multiple 42" Linestop Re-Entries, 36" Linestop and a 30" Hottap
Job Date: January 21, 2016
Location: Glendale, AZ
Job Specifics:
1 – Travel to site
ltem I - Linestop 42” PCCP Watermain – No By Pass
1 – 42” x 30” Linestop Fitting JCM ESS 415 (Fittings Installed and tested by others)
1 – Loaner Knife Gate & Hot Tap to allow for linestop entry
1 – Insertion of 42” linestop (100 PSI or less) Left in line for (7) days
1– Removal of Linestop, install completion plug and Blind Flange Pipeline Services to Supply 30” Blind and Bolt-set
ltem II – ReStop - Linestop 42” PCCP Water Main – No By Pass
1 – Removal of Blind Flanges
1 – Setting of Knife gates
1 – Removal of completion plugs
1 – Insertion of 42” linestops (100 PSI or less) Left in line for up to (7) days
1– Removal of Linestops, install completion plug and Blind Flange
ltem III – ReStop - Linestop 36” Watermain – No By Pass
2 – Loaner Knife Gate & Hot Tap to allow for linestop entry
2 – Insertion of 36” linestop (100 PSI or less) Left in line for (7) days 2” Saddle with Corp. stop and tap for blow down and equalizing (By others) 1– Removal of Linestop, install completion plug and Blind Flange