Washington
- Details
IFT Featured Tukwila, Washington Job: 2.5” Pipe Freeze Plug on Sch. 40 Steel Water System pipeline Under 100 PSI. Under 100 degrees F. - 5.0 out of
5
based on
4 reviews
2.5” Pipe Freeze Plug on Sch. 40 Steel Water System pipeline Under 100 PSI. Under 100 degrees F.
Job Status: Successful and Completed
Job Date: November 14, 2017
Location: Tukwila, WA.
Job Specifics:
ITEM I Pipe Freezing
1 - Mobilization – Prep / Travel
2– 2.5” Pipe Freeze Plugs on Water System Pipeline under 100 degrees (F) Glycol 25% or less Freeze Plugs held for up to 3 hours each freeze while you perform modifications to the pipeline
Job Date: November 14, 2017
Location: Tukwila, WA.
Job Specifics:
ITEM I Pipe Freezing
1 - Mobilization – Prep / Travel
2– 2.5” Pipe Freeze Plugs on Water System Pipeline under 100 degrees (F) Glycol 25% or less Freeze Plugs held for up to 3 hours each freeze while you perform modifications to the pipeline
OR Call
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .
- Details
IFT Featured Seattle, Washington Job: 10" Linestop on DIP-CI-PVC Water Main below ground under 100 psi with Completion Plug - 5.0 out of
5
based on
4 reviews
10" Linestop on DIP-CI-PVC Water Main below ground under 100 psi Washington with Completion Plug
Job Status: Successful and Completed
Job Date: November 3, 2017
JOB LOCATION: Seattle, WA.
PROJECT: 10" Linestop
Job Specifics:
1 – Mobilization - Prep / Travel to site:
Item I: 10” Linestop® on DIP/CI /PVC Water Main below ground under 100 psi
1 – 10” Linestop fitting - Epoxy Coated w/ SS nuts and Bolts
1 – Installation of Fittings and temporary valve with leak test.
1 – Hot Tap to allow for Linestop entry
1 – Insertion of 10” Linestop – held for up to 8 hours while Contractor performs Pipeline modifications
1 – Removal of Linestop, installation of Completion Plug and Blind Flange.
Installation of Blow-off assemblies as required for removal of Linestop
Job Date: November 3, 2017
JOB LOCATION: Seattle, WA.
PROJECT: 10" Linestop
Job Specifics:
1 – Mobilization - Prep / Travel to site:
Item I: 10” Linestop® on DIP/CI /PVC Water Main below ground under 100 psi
1 – 10” Linestop fitting - Epoxy Coated w/ SS nuts and Bolts
1 – Installation of Fittings and temporary valve with leak test.
1 – Hot Tap to allow for Linestop entry
1 – Insertion of 10” Linestop – held for up to 8 hours while Contractor performs Pipeline modifications
1 – Removal of Linestop, installation of Completion Plug and Blind Flange.
Installation of Blow-off assemblies as required for removal of Linestop
OR Call
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .
- Details
IFT Featured Seattle, Washington Job: 8” Pipe FreezePlug on Sch. 40 Steel Water System pipeline Under 100 psi - 5.0 out of
5
based on
3 reviews
8” Pipe FreezePlug on Sch. 40 Steel Water System pipeline Under 100 psi
Job Status: Successful and Completed
Job Date: November 27, 2017
JOB LOCATION: Seattle, WA.
PROJECT: 8" Pipe Freeze Plugs
Job Specifics:
Item I – 8” - FreezePlug on Sch. 40 Steel Water System pipeline – Under 100 psi – Under 100 degrees (F) Glycol Content not to Exceed 25% - if present
1 - Mobilization – Prep / Travel
4 –8” Pipe Freeze Plugs on Water System Pipeline under 100 degrees (F) Glycol 25% or less FreezePlugs held for up to 5 hours each freeze while you perform modifications to the pipeline
Job Date: November 27, 2017
JOB LOCATION: Seattle, WA.
PROJECT: 8" Pipe Freeze Plugs
Job Specifics:
Item I – 8” - FreezePlug on Sch. 40 Steel Water System pipeline – Under 100 psi – Under 100 degrees (F) Glycol Content not to Exceed 25% - if present
1 - Mobilization – Prep / Travel
4 –8” Pipe Freeze Plugs on Water System Pipeline under 100 degrees (F) Glycol 25% or less FreezePlugs held for up to 5 hours each freeze while you perform modifications to the pipeline
OR Call
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .