IFT Featured Louisiana Job: 30" PCCP Linestop on a Sewage Force Main with a 24" Bypass
- Details
IFT Featured Louisiana Job: 30" PCCP Linestop on a Sewage Force Main with a 24" Bypass - 5.0 out of
5
based on
7 reviews
New Orleans, Louisiana Linestop 30" PCCP Sewage Force Main with a 24" Bypass
Job Status: Successful and Completed
Job Date: August 31, 2018
JOB LOCATION: New Orleans, LA
PROJECT: 30" Linestop and 24" bypass
Item I Linestop 30" PCCP Sewage Force Main - 24" By Pass Pipe OD = 36.00 -Cylinder OD = 33.75 Wall= 1.125 (11/8")
1 -Travels to site
2 - 30" Linestop fittings for PCCP SFM Pipeline (1 00 PSI or less) (JCM 445 Shop Coated Primer with Epoxy Coated Water Way)
2 - Installation of saddles with air test.
2- Hot Taps to allow for linestop entry
2 - Insertion of 30" linestop for 7 Days
2 - 2" Saddle with Corp. stop and tap for blow down and equalizing pressure to remove linestop
2- Removal of Linestop, install Completion Plug and Blind Flange
Job Date: August 31, 2018
JOB LOCATION: New Orleans, LA
PROJECT: 30" Linestop and 24" bypass
Item I Linestop 30" PCCP Sewage Force Main - 24" By Pass Pipe OD = 36.00 -Cylinder OD = 33.75 Wall= 1.125 (11/8")
1 -Travels to site
2 - 30" Linestop fittings for PCCP SFM Pipeline (1 00 PSI or less) (JCM 445 Shop Coated Primer with Epoxy Coated Water Way)
2 - Installation of saddles with air test.
2- Hot Taps to allow for linestop entry
2 - Insertion of 30" linestop for 7 Days
2 - 2" Saddle with Corp. stop and tap for blow down and equalizing pressure to remove linestop
2- Removal of Linestop, install Completion Plug and Blind Flange
OR Call
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .