IFT Featured Louisiana Job: Linestop 20” DIP Gravity Sewage Main with a 14” By Pass
- Details
IFT Featured Louisiana Job: Linestop 20” DIP Gravity Sewage Main with a 14” By Pass - 5.0 out of
5
based on
12 reviews
Buckie, Louisiana 20” Linestop on D.I.P. Gravity Sewage Main with a 14” By Pass

Job Status: Successful and Completed
Job Date: April 24, 2018
JOB LOCATION: Buckie, LA
PROJECT: 20" Linestop and 14" bypass on Ductile Iron Pipe
ltem 1 - Linestop 20” DIP Gravity Sewage Main – 14” By Pass
1 – 20” Linestop fittings for DIP / Gravity Sewage Main (10 PSI or less) (JCM 442 Fusion Epoxy Coated with Stainless Steel Bolts)
1 – Installation of saddles with air test.
1 – Hot Taps to allow for linestop entry
1 – Insertions of 20” linestop for 14 Days or Less
1 – 2” Saddle with Corp. stop and tap for blow down and equalizing pressure to remove linestop
1– Removal of Linestop, install completion plug and Blind Flange
Job Date: April 24, 2018
JOB LOCATION: Buckie, LA
PROJECT: 20" Linestop and 14" bypass on Ductile Iron Pipe
ltem 1 - Linestop 20” DIP Gravity Sewage Main – 14” By Pass
1 – 20” Linestop fittings for DIP / Gravity Sewage Main (10 PSI or less) (JCM 442 Fusion Epoxy Coated with Stainless Steel Bolts)
1 – Installation of saddles with air test.
1 – Hot Taps to allow for linestop entry
1 – Insertions of 20” linestop for 14 Days or Less
1 – 2” Saddle with Corp. stop and tap for blow down and equalizing pressure to remove linestop
1– Removal of Linestop, install completion plug and Blind Flange
OR Call
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .