IFT Featured Arkansas Job: 3" Pipe Freeze Plugging Services
- Details
IFT Featured Arkansas Job: 3" Pipe Freeze Plugging Services - 5.0 out of
5
based on
5 reviews
3" Pipe Freeze Plugging Services
Job Status: Successful and Completed
Job Date: March 13, 2014
Location:Fort Smith, AR.
Job Specifics:
IFT’s Industrial Pipe freezing services were called out from the Oklahoma Office to freeze an industrial pipeline for Mitsubishi Wind Turbine plant in Fort Smith, AR. The pipeline was isolated by International Flow Technologies so the bad section of pipeline could be cut out and replaced. The facility lost no downtime while the repairs were performed.
Job Date: March 13, 2014
Location:Fort Smith, AR.
Job Specifics:
IFT’s Industrial Pipe freezing services were called out from the Oklahoma Office to freeze an industrial pipeline for Mitsubishi Wind Turbine plant in Fort Smith, AR. The pipeline was isolated by International Flow Technologies so the bad section of pipeline could be cut out and replaced. The facility lost no downtime while the repairs were performed.
OR call
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .
3" Pipe Freeze Plugging Services Slideshow of Job
3" Pipe Freeze Plugging Services Slideshow of Job