Dual 30" Linestops on PCCP Water Main with 20" Bypass
Job Status: Job completed.
Job Date: February 5, 2019
Location: Dover, Delaware
Job Specifics: 30" Linestops on PCCP Water Main with 20" Bypass
IFT is pleased to submit the following quotation.
For Linestop® Services
Line Pressure: 50 or less
Line Contents: Sewage Force Main
Flow Rate: Less Than 1 Feet per second (FPS) Flow Rate
Pipe Material: PCCP L-301
Pipe Specifications: 30” – Horizontal Linestops
Saddles: JCM 445 Carbon Steel Primer Coated W / Alloy Straps & Hardware.
Completion Plug: Carbon Steel Primer Coated
Blind Flange: Steel 150# CL D Epoxy Coated W / 2 Lifting Lugs
Maximum Flow Rate allowed: Flow rates of 1 ft/sec shall not be exceeded.
ltem l Linestop® 30” PCCP Sewage Force Main – 24” By Pass
2 – Set Up and Mobilization to site
2 – 30” Linestop Fittings for PCCP L-301 Sewage Force Main (100 PSI or less)
2 – 24” Hot Taps to allow for linestop entry
2 – Insertion of 30” linestop for 14 Days or Less
2– Removal of Linestop, install Completion Plugs and Blind Flanges. (30” ANSI 150# Flanged outlet off linestop equipment for your bypass)
Item 2 – Expediting Saddles
2 – Expedite the manufacturing of 2 JCM 445 saddles to ship by Friday 2-8-19
Job Date: February 5, 2019
Location: Dover, Delaware
Job Specifics: 30" Linestops on PCCP Water Main with 20" Bypass
IFT is pleased to submit the following quotation.
For Linestop® Services
Line Pressure: 50 or less
Line Contents: Sewage Force Main
Flow Rate: Less Than 1 Feet per second (FPS) Flow Rate
Pipe Material: PCCP L-301
Pipe Specifications: 30” – Horizontal Linestops
Saddles: JCM 445 Carbon Steel Primer Coated W / Alloy Straps & Hardware.
Completion Plug: Carbon Steel Primer Coated
Blind Flange: Steel 150# CL D Epoxy Coated W / 2 Lifting Lugs
Maximum Flow Rate allowed: Flow rates of 1 ft/sec shall not be exceeded.
ltem l Linestop® 30” PCCP Sewage Force Main – 24” By Pass
2 – Set Up and Mobilization to site
2 – 30” Linestop Fittings for PCCP L-301 Sewage Force Main (100 PSI or less)
2 – 24” Hot Taps to allow for linestop entry
2 – Insertion of 30” linestop for 14 Days or Less
2– Removal of Linestop, install Completion Plugs and Blind Flanges. (30” ANSI 150# Flanged outlet off linestop equipment for your bypass)
Item 2 – Expediting Saddles
2 – Expedite the manufacturing of 2 JCM 445 saddles to ship by Friday 2-8-19