Multiple 42" Linestop Re-Entries, 36" Linestop and a 30" Hottap

IFT Featured Arizona Job: Multiple Linestop Re-Entries and a Hottap

Job Status: Successful and Completed
Job Date: January 21, 2016
Location: Glendale, AZ
Job Specifics:
1 – Travel to site

ltem I - Linestop 42” PCCP Watermain – No By Pass
1 – 42” x 30” Linestop Fitting JCM ESS 415 (Fittings Installed and tested by others)
1 – Loaner Knife Gate & Hot Tap to allow for linestop entry
1 – Insertion of 42” linestop (100 PSI or less) Left in line for (7) days
1– Removal of Linestop, install completion plug and Blind Flange Pipeline Services to Supply 30” Blind and Bolt-set

ltem II – ReStop - Linestop 42” PCCP Water Main – No By Pass
1 – Removal of Blind Flanges
1 – Setting of Knife gates
1 – Removal of completion plugs
1 – Insertion of 42” linestops (100 PSI or less) Left in line for up to (7) days
1– Removal of Linestops, install completion plug and Blind Flange

ltem III – ReStop - Linestop 36” Watermain – No By Pass
2 – Loaner Knife Gate & Hot Tap to allow for linestop entry
2 – Insertion of 36” linestop (100 PSI or less) Left in line for (7) days 2” Saddle with Corp. stop and tap for blow down and equalizing (By others) 1– Removal of Linestop, install completion plug and Blind Flange

OR call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

42" Mechanical Linestop in Glendale, Arizona

30" Tap on water for a 42" Linestop