IFT Featured California Job: 3" Linestop on Domestic Copper waterline under 150psi
- Details
IFT Featured California Job: 3" Linestop on Domestic Copper waterline under 150psi - 5.0 out of
5
based on
3 reviews
UCLA Medical 3" Linestop on Domestic Copper waterline under 150psi

Job Status: Successful and Completed
Job Date: October 16, 2017
JOB LOCATION: Los Angeles, Ca.
PROJECT: Harbor UCLA Medical
Job Specifics:
1 – Mobilization – Prep / Travel to job site
Item I – 3” Linestop on Domestic Copper waterline under 150psi
1– 3” Linestop fitting for Domestic Copper waterline under 150 psi
1 – Installation of fittings
1 – Pressure test and hottap pipe for Linestop installation
1 – 3” Linestop held for up to 3 hours while you perform pipeline modifications
1 – Removal of Linestops and installation of completion plugs with caps
1 – Blow-off assemblies as required
Job Date: October 16, 2017
JOB LOCATION: Los Angeles, Ca.
PROJECT: Harbor UCLA Medical
Job Specifics:
1 – Mobilization – Prep / Travel to job site
Item I – 3” Linestop on Domestic Copper waterline under 150psi
1– 3” Linestop fitting for Domestic Copper waterline under 150 psi
1 – Installation of fittings
1 – Pressure test and hottap pipe for Linestop installation
1 – 3” Linestop held for up to 3 hours while you perform pipeline modifications
1 – Removal of Linestops and installation of completion plugs with caps
1 – Blow-off assemblies as required
OR Call
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .