1.5” Linestop on Copper Pipe in Santa Monica, CA.
- Details
IFT Featured California Job: 1.5" Linestop on Copper Pipe in Santa Monica, CA. - 5.0 out of
5
based on
5 reviews
1.5" Linestop on Copper Pipe in Santa Monica, CA.
Job Status: Successful and Completed
Job Date: June 11, 2018
JOB LOCATION: Santa Monica, CA.
PROJECT: 201 Ocean Ave
1 – Mobilization – Prep / Travel to Job Site
Item: I – 1.5” Linestop® on Copper Domestic Hot Waterline – under 100 psi
3 –1.5” Linestop fitting for Copper, Domestic Waterline under 100 psi
3 – Installation of fittings
3 - Pressure Test and Hottap pipe for Linestop installation
3 – 1.5” Linestop held for up to 2 hours each while you perform pipeline modifications
3 – Removal Linestop and installation of completion plugs with caps
Item: II 1” FreezePlug on Copper Domestic HWR Water Pipe under 100 degrees (F)
2 – 1” FreezePlugs on Copper Water Service lines under 100 PSI / under 100 degrees
2 - Hold FreezePlugs for up to 2 hours each.
Job Date: June 11, 2018
JOB LOCATION: Santa Monica, CA.
PROJECT: 201 Ocean Ave
1 – Mobilization – Prep / Travel to Job Site
Item: I – 1.5” Linestop® on Copper Domestic Hot Waterline – under 100 psi
3 –1.5” Linestop fitting for Copper, Domestic Waterline under 100 psi
3 – Installation of fittings
3 - Pressure Test and Hottap pipe for Linestop installation
3 – 1.5” Linestop held for up to 2 hours each while you perform pipeline modifications
3 – Removal Linestop and installation of completion plugs with caps
Item: II 1” FreezePlug on Copper Domestic HWR Water Pipe under 100 degrees (F)
2 – 1” FreezePlugs on Copper Water Service lines under 100 PSI / under 100 degrees
2 - Hold FreezePlugs for up to 2 hours each.
OR Call
Office hours 7:30 – 5:00 Central time
Nationwide: 1-800-221-3332
Emergency Services Available .