24" Linestop in Palmer, Alaska

24” Linestop in Palmer, Alaska

Job Status: Successful and Completed
Job Date: April 17, 2018
JOB LOCATION:  Palmer, AK
PROJECT: 24" Linestop

Item 1 - Linestop® 24" Ductile Iron pipe- (25.80 O.D.)
1 -Travel to site for technician(s), machinery and fittings
1 - 24" Linestop fitting JCM 412 style Fusion coated with 304 stainless steel bolts
1 -Installation of assembly
1 -Insertion of linestop on water for up to 3 days under 150 psi.
1 - Blow down tap .
1 - Removal of Linestop and installation completion plugs and Blinds

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

IFT Featured Florida Job: 3-14" Linestops in Tampa, Florida - 5.0 out of 5 based on 5 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

3-14" Linestops in Tampa, Florida

Three 14” Linestop in Tampa, Florida

Job Status: Successful and Completed
Job Date: March 22, 2018
JOB LOCATION:  Tampa, FL
PROJECT: 3-14" Linestops

1 – Travel job site – Shipping of Machinery and return

Item I – 14” Linestop® on Chilled Water
3 – 14” Linestop® weld fittings for carbon steel under 100PSI Welding provided by others.
3 – 14” Mechanical Linestops held for up to 4 days while you perform pipeline modifications
3 – Removal linestops and installation of completion plugs with Blind Flanges

Item II – 14” Hot tap on Chilled Water
1 – 14” Tapping service through your provided weld fitting and gate valve.

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

IFT Featured California Job: 30" Hottap for a 42" Linestop in Santa Maria, California - 5.0 out of 5 based on 7 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

IFT Featured California Job: 30" Hottap for a 42" Linestop in Santa Maria

30” Hottap for a 42” Linestop in Santa Maria, California

Job Status: Successful and Completed
Job Date: June 22, 2017
Location: Santa Maria, California

Job Specifics:
ltem l: Linestop® 42” CMLC Water Main – under 150 psi (approx 80 psi)
2 – Mobilization – Prep / Travel - Install 42” Linestop® & Remove Linestop®
1 – 42” Linestop® fittings for CMLC Water Pipeline (100 PSI or less)
1 – Installation / Welding of saddle with air test.
1 – Hot Taps to allow for Linestop® entry
1 – Insertion of 42” Linestop® – Linestops Held for up to 7 Days
1 – 2” Saddle with Corp. stop and tap for blow down and equalizing pressure to
remove Linestop®, as required
1 – Removal of Linestops®, install Completion Plugs and Blind Flanges

Linestop® • Valve Inserting • Pipefreeze® • Large Tapping
Linestop® is a registered Trademark and Servicemark of International Flow Technologies, Inc. 

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

30" Hottap for a 42" Linestop Made the News in Santa Maria, California

SANTA MARIA, Calif. - The city of Santa Maria is asking people to conserve water over the next two days. The voluntary request is from June 21 through June 22, while the city completes a major water main project on McCoy Lane, just west of Skyway Drive. During these two days, the amount of available water will be reduced significantly because the city's main water production facility will be shut off to the public. In preparation, the city has been filling their water storage tanks. They have about 18 million gallons of water in those reserves now to be used by people living in Santa Maria over these two days. A week ago, crews started digging up about 10 feet of dirt to work on a 42-inch-diameter concrete-lined steel pipe. Wednesday and Thursday, they'll be adding a valve to the pipe to allow the city to do further work at the city's blending station at a later date. Jim Ellis is answering the call and doing his part in the name of water conservation. We made the adjustment, we turned off our landscaping water for tomorrow," Santa Maria resident Jim Ellis said. The city of Santa Maria is asking people to voluntarily conserve water for Wednesday and Thursday, while they complete a major water main project on McCoy Lane, just west of Skyway Drive. "We want to do our part to help out," Ellis said. Ellis and other Santa Marians can help out by not watering their lawns for these two days. "We all know how important water can be, just coming off of a drought," Ellis said. In preparation, the city filled their water storage reserve tanks with about 18 million gallons of water, to be used by people living in Santa Maria over these two days. "We're actually drilling into it to access into the pipe to plug it so they don't have to shut the whole system down," technician Tom Harrison said. Technician, Tom Harrison, says the city goes through about 17 million gallons of water a day - which is close to the 18 million gallons of water the city has in its reserve for these two days - but Harrison says the project is really only supposed to take half a day and that even if the city went through their reserve water, there's nothing to worry about because the city always has two backup plans. "They have a loop system that back feeds everything.. the other one is another backup system that's tied into that one also, just in case for really a backup," Harrison said. The project will allow the city to do further work at the city's blending station at a later date. The blending station is where chlorine and small amounts of ammonia are added to the water to disinfect it. "Lawn's not going dead, but I still feel like we're helping and I think everybody should still be mindful that we're not totally out of the woods yet just because we had a wet year this year," Ellis said. A major water main project on McCoy Lane, just west of Skyway Drive in Santa Maria. (Sean Larsen / KCOY photo) There are cones and signs up there but traffic is allowed to go through. People living in the city are asked to voluntarily conserve water and wait to water your lawns until this period is over. This is a great news story how our services helped Santa Maria's residents and the credits go to this excellent news station here, https://www.keyt.com/news/santa-maria-north-county/santa-maria-residents-asked-to-conserve-water-as-major-water-main-project-gets-underway/555304182

IFT Featured Florida Job: 4- 4” Linestops on Carbon Steel Chilled Water Pipe in Tampa, Florida - 5.0 out of 5 based on 3 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

4- 4” Linestops on Carbon Steel Chilled Water Pipe in Tampa, Florida

Four Indoor 4” Linestops in Tampa, Florida

Job Status: Successful and Completed
Job Date: April  20, 2018
JOB LOCATION:  Tampa, FL
PROJECT: 4- 4” Carbon Steel Chilled Water Pipe 

1 – Travel to site

ltem l Linestop 4” Carbon Steel Chilled Water Pipe
4 – 4” Linestop Weld Fittings for Carbon Steel Hot and Chilled Water (Fitting provided by IFT and weld on by Contractor)
4 – Installation of temporary valve with air test.
4 – Hot Taps to allow for linestop entry
4 – Insertion of 4” linestops for 1 Day
4– Removal of Linestop, install Completion Plugs and Caps.

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

IFT Featured California Job: 17- 4" Hottaps in Long Beach, CA. - 5.0 out of 5 based on 6 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

17- 4" Hottaps in Long Beach, CA.

17- 4” Hottaps in Long Beach, California, Making the Tap and Retaining the Coupon
OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

Job Status: Successful and Completed
Job Date: November 16, 2017
JOB LOCATION:  Los Alamitos, CA.
PROJECT: Alamitos (OCWD) Project

1 – Mobilization – Prep / Travel to site

Item I – 4” Hottap on 12” A/C Domestic Waterline under 150 psi. Below Ground
2 – 4” Hottap on 12” A/C Waterline – below ground under 150 psi
2 - 12” x 4” JCM 432 Stainless Steel Tapping Saddle w/ SS nuts & Bolts (or Equal)
2 - 4” Mueller A2362 RW Gate Valve (or equal) – (excludes valve can & riser)
2 - Installation of fittings w/ pressure test & Hottap. 

Item II – 4” Hottap on 10” A/C Domestic Waterline under 150 psi. Below Ground
6 – 4” Hottap on 10” A/C Waterline – below ground under 150 psi
6 - 10” x 4” JCM 432 Stainless Steel Tapping Saddle w/ SS nuts & Bolts (or Equal)
6 - 4” Mueller A2362 RW Gate Valve (or equal) – (excludes valve can & riser)
6 - Installation of fittings w/ pressure test & Hottap. 

Item III – 4” Hottap on 8” DIP Domestic Waterline under 150 psi. Below Ground
5 – 4” Hottap on 8” DIP Waterline – below ground under 150 psi
5 - 8” x 4” JCM 412 Epoxy Coated Tapping Saddle w/ SS nuts & Bolts (or Equal)
5 - 4” Mueller A2362 RW Gate Valve (or equal) – (excludes valve can & riser)
5 - Installation of fittings w/ pressure test & Hottap. 

Item IV – 4” Hottap on 8” A/C Domestic Waterline under 150 psi. Below Ground
3 – 4” Hottap on 8” A/C Waterline – below ground under 150 psi
3 - 8” x 4” JCM 432 Stainless Steel Tapping Saddle w/ SS nuts & Bolts (or Equal)
3 - 4” Mueller A2362 RW Gate Valve (or equal) – (excludes valve can & riser)
3 - Installation of fittings w/ pressure test & Hottap. 

Item V – 4” Hottap on 6” DIP Domestic Waterline under 150 psi. Below Ground
1 – 4” Hottap on 6” DIP Waterline – below ground under 150 psi
1 - 6” x 4” JCM 412 Epoxy Coated Tapping Saddle w/ SS nuts & Bolts (or Equal)
1 - 4” Mueller A2362 RW Gate Valve (or equal) – (excludes valve can & riser)
1 - Installation of fittings w/ pressure test & Hottap.