1-800-221-3332
Contact us Today!

 Anchorage, AK • Delaware, DE • Oklahoma City, OK • Nashville, TN • New Orleans, LA • Houston, TX

Featured Work

IFT Featured Florida Job: 3-14" Linestops in Tampa, Florida - 5.0 out of 5 based on 5 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

3-14" Linestops in Tampa, Florida

Three 14” Linestop in Tampa, Florida

Job Status: Successful and Completed
Job Date: March 22, 2018
JOB LOCATION:  Tampa, FL
PROJECT: 3-14" Linestops

1 – Travel job site – Shipping of Machinery and return

Item I – 14” Linestop® on Chilled Water
3 – 14” Linestop® weld fittings for carbon steel under 100PSI Welding provided by others.
3 – 14” Mechanical Linestops held for up to 4 days while you perform pipeline modifications
3 – Removal linestops and installation of completion plugs with Blind Flanges

Item II – 14” Hot tap on Chilled Water
1 – 14” Tapping service through your provided weld fitting and gate valve.

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

IFT Featured Florida Job: 4- 4” Linestops on Carbon Steel Chilled Water Pipe in Tampa, Florida - 5.0 out of 5 based on 3 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

4- 4” Linestops on Carbon Steel Chilled Water Pipe in Tampa, Florida

Four Indoor 4” Linestops in Tampa, Florida

Job Status: Successful and Completed
Job Date: April  20, 2018
JOB LOCATION:  Tampa, FL
PROJECT: 4- 4” Carbon Steel Chilled Water Pipe 

1 – Travel to site

ltem l Linestop 4” Carbon Steel Chilled Water Pipe
4 – 4” Linestop Weld Fittings for Carbon Steel Hot and Chilled Water (Fitting provided by IFT and weld on by Contractor)
4 – Installation of temporary valve with air test.
4 – Hot Taps to allow for linestop entry
4 – Insertion of 4” linestops for 1 Day
4– Removal of Linestop, install Completion Plugs and Caps.

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

IFT Featured Arizona Job: 24" Hottap for a 36" Linestop in Phoenix, AZ. - 5.0 out of 5 based on 7 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

24" Hottap for a 36" Linestop in Phoenix, Arizona

24” for a 36” Linestop in Phoenix, Arizona

Job Status: Successful and Completed
Job Date: May 16, 2018
JOB LOCATION:  Phoenix, AZ
PROJECT: 36” Linestop

ltem l Linestop 36” Hobas FRP Watermain – No By Pass
1 – Loaner Knife Gates & Hot Taps to allow for linestop entry
1 – Insertion of 36” linestop (100 PSI or less) Left in line for (7) days (By others)
1 - 36” Linestop fittings, with installation and pressure test (By others)
1 - 24” Blind Flanges and Bolt-sets (By others)
1 - 2” Saddles with 2” Corp. stops, installations and taps
2– Removals of Linestops, install completion plugs and Install Blind Flanges

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

IFT Featured California Job: 17- 4" Hottaps in Long Beach, CA. - 5.0 out of 5 based on 6 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

17- 4" Hottaps in Long Beach, CA.

17- 4” Hottaps in Long Beach, California, Making the Tap and Retaining the Coupon
OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

Job Status: Successful and Completed
Job Date: November 16, 2017
JOB LOCATION:  Los Alamitos, CA.
PROJECT: Alamitos (OCWD) Project

1 – Mobilization – Prep / Travel to site

Item I – 4” Hottap on 12” A/C Domestic Waterline under 150 psi. Below Ground
2 – 4” Hottap on 12” A/C Waterline – below ground under 150 psi
2 - 12” x 4” JCM 432 Stainless Steel Tapping Saddle w/ SS nuts & Bolts (or Equal)
2 - 4” Mueller A2362 RW Gate Valve (or equal) – (excludes valve can & riser)
2 - Installation of fittings w/ pressure test & Hottap. 

Item II – 4” Hottap on 10” A/C Domestic Waterline under 150 psi. Below Ground
6 – 4” Hottap on 10” A/C Waterline – below ground under 150 psi
6 - 10” x 4” JCM 432 Stainless Steel Tapping Saddle w/ SS nuts & Bolts (or Equal)
6 - 4” Mueller A2362 RW Gate Valve (or equal) – (excludes valve can & riser)
6 - Installation of fittings w/ pressure test & Hottap. 

Item III – 4” Hottap on 8” DIP Domestic Waterline under 150 psi. Below Ground
5 – 4” Hottap on 8” DIP Waterline – below ground under 150 psi
5 - 8” x 4” JCM 412 Epoxy Coated Tapping Saddle w/ SS nuts & Bolts (or Equal)
5 - 4” Mueller A2362 RW Gate Valve (or equal) – (excludes valve can & riser)
5 - Installation of fittings w/ pressure test & Hottap. 

Item IV – 4” Hottap on 8” A/C Domestic Waterline under 150 psi. Below Ground
3 – 4” Hottap on 8” A/C Waterline – below ground under 150 psi
3 - 8” x 4” JCM 432 Stainless Steel Tapping Saddle w/ SS nuts & Bolts (or Equal)
3 - 4” Mueller A2362 RW Gate Valve (or equal) – (excludes valve can & riser)
3 - Installation of fittings w/ pressure test & Hottap. 

Item V – 4” Hottap on 6” DIP Domestic Waterline under 150 psi. Below Ground
1 – 4” Hottap on 6” DIP Waterline – below ground under 150 psi
1 - 6” x 4” JCM 412 Epoxy Coated Tapping Saddle w/ SS nuts & Bolts (or Equal)
1 - 4” Mueller A2362 RW Gate Valve (or equal) – (excludes valve can & riser)
1 - Installation of fittings w/ pressure test & Hottap.

IFT Featured California Job: 6” Linestop on 6” PVC Pipeline under 150 PSI for a Casino - 5.0 out of 5 based on 4 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

6” Linestop on 6” PVC Pipeline under 150psi for a Casino

6” Linestop on 6” PVC Pipeline under 150psi for a Casino, California

Job Status: Successful and Completed
Job Date: May 23, 2018
JOB LOCATION:  Temecula, CA.
PROJECT: Pechanga Casino

Item I: 6” Linestop on 6” PVC Pipeline under 150psi - below ground
1 – Mobilization – Prep / Travel to site
1 – 6” Linestop fittings for 6” PVC Water Pipeline (with SS/NB)
1 – Installation of temporary valve with air test.
1 – Hot Taps to allow for Linestop entry
1 – Insertion of 6” Linestop – held for up to 6 hours while ‘Others’ perform Pipeline Modifications.
1 – Removal of Linestops, installation of completion plugs and blind flanges Installation of Blow-off assemblies as required for removal of Linestop.

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

Subcategories

Go to top