1-800-221-3332
Contact us Today!

 Anchorage, AK • Delaware, DE • Oklahoma City, OK • Nashville, TN • New Orleans, LA • Houston, TX

California

IFT Featured California Job: 6" Linestop on Natural Gas HDPE Pipe in Vandenberg Air Force Base, CA. - 5.0 out of 5 based on 4 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

6" Linestop on Natural Gas HDPE Pipe in Vandenberg Air Force Base, CA.

6” Vandenberg Air Force Base, CA. Natural Gas Pipe Linestop Services
OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

Job Status: Successful and Completed
Job Date: November 27, 2017
JOB LOCATION:  Vandenberg Air Force Base, CA
PROJECT: 6" Linestop®
Job Specifics:
Item I – 6” - linestop® on Natural Gas HDPE pipeline 
1 - Mobilization – Prep / Travel
1 - 6”  Hot tap on Natural Gas 6" HDPE Pipeline
1 – Installation of 6" Linestop, left in pipeline for up to 7 days
1 – Travel to site
1 – Removal of linestop and install of completion plug  

1. Vandenberg-AFB, CA. IFT’s gas division maintains many of the natural gas systems around America. IFT crews have been welding on gas lines for many years and are certified in gas fusing, welding, tapping and Linestop® services. This allows for repair of gas pipelines, by using hot tapping for connections, Linestop® and bypassing to reroute gas pipelines.

2. After this Linestop® was installed, “plugging” the existing gas main where no valve existed, it allowed the pipeline to be diverted without shutting down this military base. On this project, the existing natural gas line passed through an area where a new missile launch pad was to be built, so IFT was contracted to reroute this pipeline while keeping the military base operational.  

3. Once the Linestop® was installed on the old steel natural gas line, IFT purged the old line, cut the pipe and welded on a Steel to HDPE transition fitting so the new pipeline could be HDPE. Welding on natural gas lines as shown here can sometimes have a flame, this is caused from a small amount of gas passing by the linestop®. Sometimes this gas is burned purposely so gas cannot collect somewhere else.  

4. IFT crews are also certified to Fuse HDPE gas pipe. 

5. Now that this pipeline is rerouted away from the new construction zone. Construction at the launch pad can begin. 

6. IFT has tooling that removes the Linestop® under pressure and leaves a cap or flange.

30” Linestop 20” By-pass on AC Sewage Pipe, 30” Line stop on RCP Sewer Outfall Pipe & 20” Tap for Bypass - 5.0 out of 5 based on 18 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

30” Linestop with a 20” By-pass on AC Sewage Pipe, 30” Linestop on RCP Sewer Outfall Pipeline and 20” Hottap for Bypass Connection

1- 30” Linestop with a 20” By-pass on AC Sewage Pipe, 1-30” Linestop on RCP Sewer Outfall Pipeline and 1-20” Hottap for Bypass Connection
OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

Job Status: Successful and Completed
Job Date: March 28, 2018
JOB LOCATION:  San Elijo, CA.
PROJECT: 30" Linestop Sewer Outfall

Job Specifics: 1- 30” Linestop with a 20” By-pass on AC Sewage Pipe, 1-30” Linestop on RCP Sewer Outfall Pipeline and 1-20” Hottap for Bypass Connection

Our Proposal is based on:
Installation of TWO 30” Linestops. One on AC Pipe, One on RCP. One Linestop (ACP) to have a 20” Flanged outlet and Temporary 20” Valve for By-pass Outlet, The second Linestop does not require a By-pass Outlet. We will also install a 30” x 20” Tapping Saddle ‘Tee’ on RCP, just west of our Linestop for By-pass use, which will include the use of a Temporary 20” Valve.

Please Note: We will use a Linestop Flange on the 30” x 20” Tapping Saddle so that we can install a Completion Plug and Blind Flange when the By-pass is complete, Thus, no permanent Valve remains on the Tapping ‘Tee’ All information based on Drawing C-13 sheet 19 of 21

ltem l Linestop - 30” on A/C Sewer Outfall Pipeline – under 100 psi
2 – Mobilizations / Travels to site – Installation of Linestops / Removal of Linestops
1 – 30” x 24” Linestop fittings for A/C Pipe (ANSI 150) (on One Linestop) JCM 442 Epoxy Coated with 304 - SS/ Hardware 1 - Installation of ONE 20” Temporary Valve for By-pass use. 1 – Installation of Assemblies with air test.
1 – Hot Taps to allow for Linestop entry
1 – Insertion of 30” Linestops for up to 30 days, while others perform pipeline work.
1– Removal of Linestops, install completion plugs and Blind Flanges
1 – Blow-off assembly as required 
20” Flanged Outlet for By- Pass

ltem Il Linestop - 30” on RCP Sewer Outfall Pipeline No By-pass- under 50 psi
2 – Mobilizations / Travels to site – Installation of Linestops / Removal of Linestops
1 – 30” x 24” Linestop fittings for RCP Pipe (ANSI 150) JCM 442 Epoxy Coated with 304 - SS/ Hardware
1 – Installation of Assemblies with air test.
1 – Hot Taps to allow for Linestop entry
1 – Insertion of 30” Linestops for up to 30 days, while others perform pipeline work.
1– Removal of Linestops, install completion plugs and Blind Flanges
1 – Blow-off assembly as required 

Item III 30” x 20” Hottap on RCP Sewer Outfall Pipeline – under 50 psi
1 - Travels to site
1 - 30” x 20” Tapping Saddle for RCP Pipe (ANSI 150) under 50 psi - JCM 442 Epoxy Coated with 304 - SS/ Hardware (Includes Completion Plug and Blind Flange) Includes use of Temporary 20” Valve on Tee for By-pass Use.

Item IV RE: Monel or Hastelloy Nuts & Bolts on Buried Fittings
All Fittings that will remain permanent / buried will be supplied with Monel or Hastelloy Nuts & Bolts as opposed to Stainless Steel.

IFT Featured California Job: 6” Linestop on 6” PVC Pipeline under 150 PSI for a Casino - 5.0 out of 5 based on 4 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

6” Linestop on 6” PVC Pipeline under 150psi for a Casino

6” Linestop on 6” PVC Pipeline under 150psi for a Casino, California

Job Status: Successful and Completed
Job Date: May 23, 2018
JOB LOCATION:  Temecula, CA.
PROJECT: Pechanga Casino

Item I: 6” Linestop on 6” PVC Pipeline under 150psi - below ground
1 – Mobilization – Prep / Travel to site
1 – 6” Linestop fittings for 6” PVC Water Pipeline (with SS/NB)
1 – Installation of temporary valve with air test.
1 – Hot Taps to allow for Linestop entry
1 – Insertion of 6” Linestop – held for up to 6 hours while ‘Others’ perform Pipeline Modifications.
1 – Removal of Linestops, installation of completion plugs and blind flanges Installation of Blow-off assemblies as required for removal of Linestop.

OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

IFT Featured California Job: 17- 4" Hottaps in Long Beach, CA. - 5.0 out of 5 based on 6 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

17- 4" Hottaps in Long Beach, CA.

17- 4” Hottaps in Long Beach, California, Making the Tap and Retaining the Coupon
OR Call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .

 

 

Job Status: Successful and Completed
Job Date: November 16, 2017
JOB LOCATION:  Los Alamitos, CA.
PROJECT: Alamitos (OCWD) Project

1 – Mobilization – Prep / Travel to site

Item I – 4” Hottap on 12” A/C Domestic Waterline under 150 psi. Below Ground
2 – 4” Hottap on 12” A/C Waterline – below ground under 150 psi
2 - 12” x 4” JCM 432 Stainless Steel Tapping Saddle w/ SS nuts & Bolts (or Equal)
2 - 4” Mueller A2362 RW Gate Valve (or equal) – (excludes valve can & riser)
2 - Installation of fittings w/ pressure test & Hottap. 

Item II – 4” Hottap on 10” A/C Domestic Waterline under 150 psi. Below Ground
6 – 4” Hottap on 10” A/C Waterline – below ground under 150 psi
6 - 10” x 4” JCM 432 Stainless Steel Tapping Saddle w/ SS nuts & Bolts (or Equal)
6 - 4” Mueller A2362 RW Gate Valve (or equal) – (excludes valve can & riser)
6 - Installation of fittings w/ pressure test & Hottap. 

Item III – 4” Hottap on 8” DIP Domestic Waterline under 150 psi. Below Ground
5 – 4” Hottap on 8” DIP Waterline – below ground under 150 psi
5 - 8” x 4” JCM 412 Epoxy Coated Tapping Saddle w/ SS nuts & Bolts (or Equal)
5 - 4” Mueller A2362 RW Gate Valve (or equal) – (excludes valve can & riser)
5 - Installation of fittings w/ pressure test & Hottap. 

Item IV – 4” Hottap on 8” A/C Domestic Waterline under 150 psi. Below Ground
3 – 4” Hottap on 8” A/C Waterline – below ground under 150 psi
3 - 8” x 4” JCM 432 Stainless Steel Tapping Saddle w/ SS nuts & Bolts (or Equal)
3 - 4” Mueller A2362 RW Gate Valve (or equal) – (excludes valve can & riser)
3 - Installation of fittings w/ pressure test & Hottap. 

Item V – 4” Hottap on 6” DIP Domestic Waterline under 150 psi. Below Ground
1 – 4” Hottap on 6” DIP Waterline – below ground under 150 psi
1 - 6” x 4” JCM 412 Epoxy Coated Tapping Saddle w/ SS nuts & Bolts (or Equal)
1 - 4” Mueller A2362 RW Gate Valve (or equal) – (excludes valve can & riser)
1 - Installation of fittings w/ pressure test & Hottap.

IFT Featured California Job: 1.5" Linestop on Copper Pipe in Santa Monica, CA. - 5.0 out of 5 based on 5 reviews

User Rating: 5 / 5

Star ActiveStar ActiveStar ActiveStar ActiveStar Active

1.5" Linestop on Copper Pipe in Santa Monica, CA. 

1.5” Linestop on Copper Pipe in Santa Monica, CA.

Job Status: Successful and Completed
Job Date: June 11, 2018
JOB LOCATION:  Santa Monica, CA.
PROJECT: 201 Ocean Ave

1 – Mobilization – Prep / Travel to Job Site

Item: I – 1.5” Linestop® on Copper Domestic Hot Waterline – under 100 psi
3 –1.5” Linestop fitting for Copper, Domestic Waterline under 100 psi
3 – Installation of fittings
3 - Pressure Test and Hottap pipe for Linestop installation
3 – 1.5” Linestop held for up to 2 hours each while you perform pipeline modifications
3 – Removal Linestop and installation of completion plugs with caps 

Item: II 1” FreezePlug on Copper Domestic HWR Water Pipe under 100 degrees (F)
2 – 1” FreezePlugs on Copper Water Service lines under 100 PSI / under 100 degrees
2 - Hold FreezePlugs for up to 2 hours each.