Chula Vista, Police Station Facility 6" Hottap on 6" Schedule 40 Carbon Steel Condenser Waterline under 100 psi

Chula Vista, Police Station Facility 6inch Hottap on 6inch Schedule 40 Carbon Steel Condenser Waterline under 100 psi

Job Status: Successful and Completed
Job Date: August 31, 2017
JOB LOCATION: Chula Vista, CA
PROJECT: Police Station Facility Hottap
Job Specifics:
ITEM I – 6” Hottap on 6” Sch. 40 Carbon Steel Condenser Waterline - under 100 psi.
2 – 6” Hottap on 8” Sch. 40 Carbon Steel Condenser Waterline – under 100 psi
2 – 6” x 6” Weld-on Full Wrap Tapping Sleeve - Flanged Outlet
2 - 6” Full Port Flanged Valves – ‘EXCLUDED’ CUSTOMER TO SUPPLY VALVES
2 - Welding of Materials w/ pressure tests  

ITEM II – 10” Hottap on 10” Sch. 40 Carbon Steel Condenser Waterline - under 100 psi.
1 – 10” Hottap on 8” Sch. 40 Carbon Steel Condenser Waterline – under 100 psi
1 – 10” x 10” Weld-on Full Wrap Tapping Sleeve - Flanged Outlet
1 - 10” Full Port Flanged Valves – ‘EXCLUDED’ CUSTOMER TO SUPPLY VALVES
1 - Welding of Materials w/ pressure tests 

OR call

Office hours 7:30 – 5:00 Central time

Nationwide: 1-800-221-3332

Emergency Services Available .